Building a silage pit with concrete blocks has the potential to help sustain your farm’s forage for years to come. Concrete blocks, particularly interlocking concrete blocks can easily facilitate this, but how is it done?
In this blog, we will share how to build a silage pit with concrete blocks.
At PPC Concrete Products, we are here to provide solutions for your construction needs, from the person working their own part-time project, to commercial clients, and everyone in-between.
Monthly construction output had risen an estimated by an 1.6% value in June 2023, and we would like to think our accessible concrete products had a small part to play by giving our clients easy access to reliable and easy-to-use construction solutions.
Do I need machinery to build a silage pit with interlocking concrete blocks?
Yes, you will almost certainly need machinery to build a silage pit with interlocking concrete blocks. Without using machinery, you may be able to make a very small-scale silage pit. Below are the key considerations you should keep in mind to determine if you need to use machinery:
- Weight of the Blocks: Interlocking concrete blocks are extremely heavy. Even smaller blocks can potentially weigh hundreds of kilograms, and larger ones can weigh several tons. Manually lifting and positioning these blocks is not only impractical, and highly unlikely, but also extremely dangerous.
- Handling and Placement: Machinery is essential for safely and efficiently moving the blocks from delivery trucks to the construction site and precisely placing them in their correct positions. This is especially the case with Interlocking concrete blocks, as they need to be placed in a specific way in order to interlock.
- Site Preparation: Depending on the site, you might need machinery for:
- Clearing and Leveling: Removing vegetation, topsoil, and debris, and leveling the ground.
- Excavation: Digging for the foundation, especially if you’re using a concrete base.
- Compaction: Compacting the ground or base material to provide a stable foundation.
What machinery can I use to move Interlocking concrete blocks
- Excavator: For site preparation, excavation, and potentially some lifting.
- Telehandler or Forklift: These are ideal for lifting, moving, and placing the concrete blocks. Telehandlers offer greater reach and versatility, while forklifts are more suitable for level surfaces.
- Crane: For very heavy blocks or complex lifting operations, a crane might be necessary.
- Compactor: For compacting the ground or base material.
Considerations
- Block Size and Weight: The size and weight of the blocks will determine the type and capacity of machinery required.
- Site Access: If you are going to use heavy machinery, ensure the site has adequate access for the necessary machinery.
- Cost: Renting or hiring machinery will add to the overall cost of the project.
While it might theoretically be possible to build a very small silage pit with very small blocks without heavy machinery, it’s generally not feasible or safe for most practical applications. Using appropriate machinery is crucial for efficient construction, worker safety, and the structural integrity of the silage pit.
How to build a silage pit with concrete blocks
Building a silage pit with interlocking concrete blocks offers a durable and efficient solution for forage storage. But how is it done? Below is a general guide with critical information you need to understand before, and during construction.
1. Planning and Preparation
Determine Size and Capacity:
Calculate the required size of the pit based on the number of livestock, the amount of forage to be stored, and the desired storage period. Consider factors like feed consumption rates and silage density.
Site Selection:
Choose a well-drained location with good access for machinery. Ensure the site is level or can be easily leveled. Avoid areas prone to flooding or waterlogging.
Obtain Necessary Permits:
Check with local authorities for any required building permits or environmental approvals.
Clear and Level the Site:
Remove any vegetation, topsoil, and debris from the site. Level the area using appropriate earthmoving equipment. Compact the ground thoroughly to provide a stable base.
Consult with Experts:
If you’re unsure about any aspect of the construction process, consult with a structural engineer or experienced contractor.
Follow Manufacturer’s Instructions:
Always follow the manufacturer’s instructions for the specific type of interlocking concrete blocks you are using.
Proper Compaction:
Proper compaction of the silage is crucial for good preservation. Use appropriate machinery and techniques to achieve optimal compaction.
2. Foundation
Concrete Base (Recommended):
A concrete base is highly recommended for optimal stability and drainage.
- Excavation: Excavate the area for the concrete base to the desired depth (typically 150-200mm).
- Compaction: Compact the sub-base thoroughly.
- Formwork: Construct formwork to contain the concrete pour.
- Reinforcement (Optional but Recommended): Place reinforcing mesh or rebar within the formwork for added strength.
- Pour Concrete: Pour concrete into the formwork and level it. Ensure a smooth and even surface.
- Curing: Allow the concrete to cure for the recommended time (usually 7-28 days).
Alternative Base (Less Durable):
A compacted gravel or hardcore base can be used as a less expensive alternative, but it may not provide the same level of stability and drainage as a concrete base.
3. Wall Construction
Block Delivery and Handling:
Arrange for delivery of the interlocking concrete blocks. Use appropriate lifting equipment (e.g., forklift, crane) to move and position the blocks safely.
First Course:
Start laying the first course of blocks on the prepared base. Ensure the blocks are level and aligned correctly. Use a spirit level and string line to maintain accuracy.
Interlocking:
Interlock the blocks according to the manufacturer’s instructions. Most interlocking blocks have a tongue-and-groove or similar system that provides a secure connection.
Subsequent Courses:
Continue laying subsequent courses of blocks, ensuring each course is level and interlocked with the previous one. Stagger the joints between courses for added strength.
Corners and Joints:
Pay special attention to corners and joints. Use corner blocks or cut blocks as needed to create a tight and secure structure.
Wall Height:
Build the walls to the desired height. Consider the height of the machinery that will be used to fill and empty the pit.
4. Sealing and Finishing
Joint Sealing (Recommended):
Seal the joints between the blocks with a suitable sealant to prevent air and water infiltration. This is especially important for the bottom courses and any joints that may be exposed to silage effluent.
Wall Protection (Optional but Recommended):
Consider applying a protective coating to the inside of the walls to protect them from silage acids and abrasion.
Drainage:
Ensure proper drainage around the pit to prevent water from accumulating. This may involve installing drainage pipes or creating a sloping surface away from the pit.
5. Safety Considerations
Working at Heights:
Take necessary precautions when working at heights, such as using safety harnesses and scaffolding.
Lifting Heavy Objects:
Use appropriate lifting equipment and follow safe lifting practices to prevent injuries.
Site Safety:
Maintain a clean and organised work site to minimize hazards.
Build a silage pit with concrete blocks
As an established supplier all over the UK, PPC Concrete Products is always happy to help, which is why we encourage you to get in touch with any questions you may have or have a look at our FAQ.
In this blog, we hope to have shown you information regarding how to build a silage pit with concrete blocks. Whilst also providing extra information in regard to construction solutions that we offer.
Take a read of our case studies to truly understand how we have provided solutions for business in the past with the use of our interlocking concrete blocks, and ultimately, how we can help you today.
Read our blog page for more insights into our passion, construction.
Address:
The Old Gasworks,
Higginshaw Lane,
Royton,
Oldham,
OL2 6HQ
Opening Hours:
Monday to Friday – 8 AM until 4 PM
Tel: 01706 655245
Email: info@ppcconcreteproducts.co.uk